Concrete and 2 centimeters
- 21.12.2020
To begin with, using a ruler and a spatula, cut through the upper soil layer, outlining all the square segments of the tracks. Then we dig the recesses, the height of which should be approximately 15 centimeters (5 centimeters are allocated to the crushed stone layer, 8 centimeters per concrete and 2 centimeters will take tiles).