The GND
- 02.07.2020
The pipes laid in a prepared well are welded in advance and also extended by installing the GND.
At the final stage, the Contractor must prepare and transfer the entire design and executive documentation to the customer.
The pipes laid in a prepared well are welded in advance and also extended by installing the GND.
At the final stage, the Contractor must prepare and transfer the entire design and executive documentation to the customer.