Автоновинки

Surface of the

It should be noted that the bottom filling is performed simultaneously with the walls (in this case, there will be no seams that require sealing). After forming, the surface of the concrete must be covered with burlap, straw or other material, and the structure itself should be moistened for four weeks before the set of branded strength with concrete (the formwork can be removed a week after molding).