Installing the
- 28.12.2020
The volume of work on the construction of tread protection plants includes drilling wells or digging pits (diameter at least 250 mm), installing the tread in the well (pit), filling the well with the activator (when installing treads without activator), connecting the tread wire to the pipeline and, if necessary Installation of the contact device.